Turf Replacement Process

1.  A gravel/sand layer will be uncovered and leveled.  It is important that we do not enter the infield during this time, disturbing the leveling process will result in additional time and expenses.
 
2.  An e-layer will be poured.  After the e-layer cures, it will have the feel as a track surface.  At that point use of the infield will be permitted. A sample of the e-layer is available in the office for viewing.
 
3.  The new turf will be added during the summer months.
 
The timing of each process is important to ensure the infield is ready for use by football season!